CivilTech Engineering

Kingwood Marina


  • Kingwood Marina
  • Kingwood Marina

Project Description:

Kingwood Marina is a uniquely planned community, adjacent to the San Jacinto River, comprised of multiple sections including a Commercial District, Marina District, and a Residential District developed around a marina concept. The project consisted of surveying and engineering design for excavation, paving and grading, water mains, storm sewers, sanitary sewers, Marina excavation and amenity features, and street paving for a 308-acre development which includes 2,500 equivalent single family units comprised of multi-family, commercial, retail, hotel, and residential lots.

Project Details:
Client:
Kingwood Marina
Location:
San Jacinto River
Service Provided:
  • Design of several bridges to provide access to the site during extreme events
  • Coordination of capacity for wastewater and water capable of serving the developments need and coordination of infrastructure with in TIRZ 10 inside the City of Houston city limits.
  • Permitting development in the flood plain and flood way within the San Jacinto River watershed
  • Design of a complex drainage system consisting of multiple drainage systems and a Marina utilized as the center piece to the development