Gessner Road Improvements from West Road to Beltway 8


Project Description:

CivilTech is currently providing professional engineering services for Gessner Road from West Road to Beltway 8 in Harris County Precinct 4. When complete, the project will consist of approximately 91,00 feet of new roadway with four-lane concrete boulevard, curb and gutter roadway with storm sewers providing continuous access from Beltway 8 to West Road. Proposed construction sequencing and traffic control plans were developed to maintain access to all existing cross roads and driveways during construction. Temporary traffic signals were designed for the intersection of Gessner and Fallbrook to maintain operations throughout construction.
 

Project Details:
Client:
Harris County Engineering
Location:
Harris County, TX
Service Provided:
  • Roadway Design
  • Bridge Design
  • Drainage Design
  • Detention Pond Design
  • SW3P and Storm Water Quality Design
  • Traffic Control Plans
  • Geotechnical Engineering